Ercan Airport

COUNTRY
TRNC
LOCATION
LEFKOSA
CONSTRUCTION AREA
7.300 000 m2
CLIENT
TAS YAPI
ARCHITECTURAL DESIGNER
BOLD Architecture
COMPLETION
2019

Site Wide Electrical Infrastructure, Medium Voltage Distribution, Utility Center

SERVICES
    • Medium Voltage Power Distribution

    • Transformers

    • Power Compensation

    • Emergency Generator Back-Up System

    • UPS Systems (Uninterrupted Power Supply)

    • MV, LV Short Circuit Calculations

    • Low Voltage Power Distribution

    • Electrical Panel Details

    • Grounding System

    • Lightning Protection System

    • Internal and External Lighting

    • Emergency Lighting System

    • Security (CCTV, Card Access Control) Systems

    • Fire Detection and Alarm System

    • Emergency Announcement System

    • Interphone System

    • ICT-Telecommunication-Data Network System

    • Scada System

    • Building and Energy Automation

    • Flight Data Information (FIDS) System

    • Central Time Clock System

    • Landing Area Lighting

    • 400 Hz. Plane Energy Power Supply System

    • Visual Docking Guidance System (VDGS)

    • Ramp Tower Communication System

    • Electrical Site Infrastructure-Cable Gallery, Duct Bank, Manholes/Hand holes, Road and Landscape Lighting