Send-Out Capacity Increase Construction Work consists of below facilities;
Warm Water Basin and Pumps, Out Fall Channel, ORV Building, Pipe Way Sleepers, Metering Station, Metering Control & Analyzer Room, Road Section to Metering, Pipe Rack, 3 Send Out Pumps, Pipeline Compressor, Cooling Tower, Fire Water Pumps, Diesel Generator, Administration Building
Scope of Design services,
Medium Voltage (33kV & 6.3 kV) / LV distribution to facilities and buildings inclusive feeders from TEIAS TM/GIS 154kV/33kV Plant and provisions for future developments.
Medium Voltage Power Distribution
Transformer Substation
Emergency Generator Back-Up system
UPS Systems (Uninterrupted Power Supply)
MV, LV Short Circuit calculations
Power Factor Correction and Harmonic Filtration
MCC & Electrical Panel Details
Low Voltage Power Distribution (0.4kV Utility, Process&Mechanical Equipment)
Grounding System
Lightning Protection System
Internal and External Lighting
Emergency Lighting System
Security (CCTV, Card Access Control) Systems
Fire Detection and Alarm System
Emergency Announcement System
ICT-Telecommunications-Data Network System
Lighting Automation
Cable, Cable Raceway and Busbar Power Distribution
Site wide Electrical Site Infrastructure including setting sizing and section requirement for Manholes, Duct banks, Galleries, Utility tunnels, Pipe rack etc.